Showing posts with label Home Paint Colors. Show all posts
Showing posts with label Home Paint Colors. Show all posts
Wednesday, October 16, 2013
Wordless Wednesday
As you can see we're still making progress on our house this fall. The new coat of paint to the outside I think just freshens up to house, along with removing the over grown bushes. Next year our plan is to look beyond the house and make some more decisions on the rest of the acreage, i.e. outbuildings, landscaping, etc. I'm looking forward to that and hopefully still adding a deck this year before it snows. To see some of the inside updates check out my Moving Up Monday posts:
Monday, July 29, 2013
Moving Up Monday
It is time for a new Moving Up Monday update. Work keeps moving along on the house and hopefully in the next couple of weeks work will not only ramp up but maybe even wrap up!
The biggest news is that the upstairs is almost done! Every room has been painted, along with every closet, the hallway and the stairwell thanks to My Mom, My Farmer and My Father-in-Law. Work that still needs to be done in the upstairs includes carpet being installed in the nursery and the master bedroom, as well as the half bath needs to be installed. Good news is that I think all of those items will be finished this week! Here is a look at how the upstairs has came along since the last update:
| Master Bedroom paint - Glidden's Partridge Gray GLD808 (Photo taken July 17, 2013) |
| Master Bedroom new sliding closet doors (Photo taken July 23, 2013) |
| LP's Bedroom paint - Glidden's Open Sesame #10362 (Photo taken July 23, 2013) |
| LP's Bedroom finished Carpet, Paint, Windows, Ceiling fan/light, Wood Work (Photo taken July 27, 2013) |
| LP's Bedroom Closet (Photo taken July 27, 2013) |
| LP loves his newly finished bedroom! |
| MP's Bedroom paint - Glidden's Homemade Custard #10412 (Photo taken July 23, 2013) |
| Half bath paint - Glidden's Partridge Gray GLD808 Built in storage unit installed (Photo taken July 17, 2013) |
| Built in storage getting final coats of paint Sink and toilet ready to be installed (Photo taken July 23, 2013) |
| A look at our general contractor putting up drywall in the Mudroom/Laundry Room/Office (Photo taken July 23, 2013) |
| Mudroom drywall installed and mudding being done A look at the built in closet (Photo taken July 27, 2013) |
| Mudroom walls being mudded (Photo taken July 27, 2013) |
| Drywall being installed in the Bathroom (Photo taken July 27, 2013) |
| A look at a new vent in the back of the Bathroom closet The heating and cooling guys are finishing their work on the vents for the new central air/heat system (Photo taken July 27, 2013) |
Hopefully there is enough progress this week that there will be a new Moving Up Monday update next week!
Check out how far we've come on our home remodel by checking out past "Moving Up Monday" reports:
Monday, July 15, 2013
Moving Up Monday
It is time for a long over due "Moving Up Monday" update! I think the best way to update you all on the house is to go room by room.
Kitchen and Dining Room
| Looking into Kitchen from Dining Room (Photo taken July 8, 2013) |
![]() |
| Tarkett Nafco Good Living Honey Oak 3" GLP420 |
Living Room and Den/Playroom
| A view of the Den/Playroom In this current work space you can see the new sliding closet doors for My Farmer's and My room and you get a good look at our new windows. (Photo taken July 14, 2013) |
The Living Room and Den/Playroom will be painted in the same Winter Oats color as the Kitchen and Dinning Room. And we have decided to carpet the Living Room and Den/Playroom space:
![]() |
| Gulistan Bombay Oatmeal 4022-241 |
The tile we went with is:
![]() |
| Tarkett Permastone Travertine Weathered Beach |
Downstairs Bathroom
| A view of the Downstairs Bathroom from the shower/tub You can see the sink and vanity area to the left and the closet from the original hallway to the right. (Photo taken July 8, 2013) |
Upstairs 1/2 Bath
| The Upstairs 1/2 bath after having dry wall installed. The open hole is where a built in storage unit will be placed. (Photo taken July 9, 2013) |
| The Upstairs 1/2 bath after having a primer coat painted. You can see the old kitchen tile floor as well as the hook-ups for the toilet and sink. (Photo taken July 14, 2013) |
| A look at the primed walls and space for the built in cabinet. (Photo taken July 14, 2013) |
Bedrooms
| A view of LP's built in closet shelves that were made and installed. (Photo taken July 14, 2013) |
| A view of MP's room which is being used as a building area for the 1/2 bath's built in storage. (Photo taken July 14, 2013) |
Both My Farmer's and My Room and MP's will be installed with Shaw Flooring's Manhattan Gray #704 carpet (which I couldn't find a photo of online) and LP's room will be installed with Shaw Flooring's Argentina Sky Crewel Work #104:
![]() |
| We thought this carpet would be very "farmable" for LP and at the same time the pattern isn't too crazy that it can grow with him and whoever might be living in that bedroom in the future |
Septic Tank and Leach Field
Other than all of that, the biggest thing that has been worked on has been installing our new and updated septic system and leach field. We installed a new cement septic tank that brings us up to current codes and then created a leach field that will remove liquid that emerges from the septic tank.
| Our new Septic Tank (Photo taken July 12, 2013) |
| Installing the pipes from the Septic Tank to the Leach Field area (My Farmer is on the right) (Photo taken July 12, 2013) |
| Now it is time to grow grass again on top of the Septic Tank and Leach Field area (Photo taken July 14, 2013) |
So as you can see we still have quite a bit of work to finish on the house but I trust our general contactor, plumber, and other helpers that the projects will be wrapping up soon so we can move into a finished home.
Check out how far we've come on our home remodel by checking out past "Moving Up Monday" reports:
Monday, June 17, 2013
Moving Up Monday
I'm excited to share a "Moving Up Monday" update with all of you today - there has been quite a bit done to our new house since the last time I shared about our home remodel!
First up, the progress on our Mudroom/Laundry Room/Office. We knocked down the wall between the "laundry hallway" and the old first floor bedroom.
| Photo taken from back of the old first floor bedroom looking through to the old laundry hallway creating one larger mudroom/laundry room/office. (Photo taken May 26, 2013) |
| The closet will be easily accessed as you enter the house. We will be using the old closet doors from the original downstairs bedroom as the new mudroom closet's doors. (Photo taken June 11, 2013) |
| Photo taken from the old doorway of the bathroom. (Photo taken May 23, 2013) |
| My "studs" (LP and My Farmer) taking out the old studs. (Photo taken May 26, 2013) |
| Don't mess with me - I'm strong enough to break hammers in half! |
| Photo taken from toilet area looking through to both entrances for the bathroom, one from the dining room (where LP is) and one from the mudroom. (Photo taken June 11, 2013) |
| Photo taken from shower are looking at vanity area, as well as looking at the linen closet that was kept from "old hallway". (Photo taken June 11, 2013) |
| Our general contractor is building some "open" storage where the wall/roof slants, as well as some shelved storage around the chimney. (Photo taken June 16, 2013) |
| New/additional closet door accessible from the hallway (Photo taken May 23, 2013) |
| You can see the new sliding door area. The old doorway will be covered up/drywall installed. (Photo taken May 23, 2013) |
- Removed all the carpet,
- Had outlets installed on every wall in every room (those of you who live in old homes know how big of a deal this is - older homes usually only have one outlet for each room and it is usually oddly placed and is outdated by only have two prong openings and not three),
- Been stripping wood panels and windows that were painted, which we are now having stained back to their "original" condition,
- And have removed a lot of tree seedlings from around the property (but I'm afraid there are hundreds of seedlings that still need to be cleaned up!).
In the coming weeks things we're looking forward to seeing:
- Electrical work finishing up,
- New windows being installed,
- Additional kitchen cupboards being installed,
- Both bathrooms becoming functioning,
- Central air/heat being installed,
- And to be able to start painting the rooms (all of which will have a primer of white painted to start with).
As you can see, a lot of progress has happen but at the same time we've got a lot of work to go before we plan on moving in at the end of July. We still need to think through paint colors for all the rooms in the house, as well as flooring for the bedrooms. Do you have some favorite paint colors for Living Rooms, Kitchens, Bathrooms, Bedroom, etc? And/or do you think we should leave hard woods in the upstairs bedrooms or carpet the bedrooms?
Subscribe to:
Posts (Atom)






